Pipes

21.0 – Differences in Expectations

The build is coming to a close and this was our most intense meeting so far. The differences between our expectations and those of the French trades comes to the fore.

16.0 – Coloured Render

Two significant changes to the house this visit. The coloured external render has begun and looks great. Inside the final layer of concrete has been poured and is drying.

15.0 – Underfloor Heating

Having endured freezing winters in old French apartments, we delight in seeing the underfloor heating pipes laid in the house. Pipes cover the entire floor of the house and will ensure this will be our last cold winter.