Kitchen
17.0 – Electricity and Final Concrete Pour
The electricity has been turned on and the final layer of concrete has been poured on the floor. The internal floor of the house is at the correct level and we can turn on and off lights.
The electricity has been turned on and the final layer of concrete has been poured on the floor. The internal floor of the house is at the correct level and we can turn on and off lights.